A US$35m loan was sized on EBITDA of US$10m. Halfway through the year, management cuts its forecast to US$7m.
Loan Tail: a Worked Example
Finish the loan before the cash does, and a bad year has room.
BY MICHAEL SHANG · SIXTEEN YEARS IN COMMERCIAL BANKING · UPDATED
// THE SHORT ANSWER
When a term loan will be repaid from a contract, a lease or an asset that stops earning on a known date, the tail is the stretch of that income still running after the loan's last repayment. It is the room a lender keeps for the forecast to go wrong: a missed instalment can be moved into the tail, and the loan still finishes before the money does. Lenders state it in years, in forecast cash, or as the gap between two cover ratios. A loan with no tail has to be met on schedule, because there is nothing behind it to move into.
BASIS Practitioner judgment from sixteen years in commercial banking, set out in How Bankers Think (Highbank Press, 2026). Every borrower on this site is a composite constructed for teaching, not a client. The market is mid-market commercial lending as practised in New Zealand and Australia; where a convention differs elsewhere, the page says so.
// MAKE THE CALL
Issue 11 — The Term Sheet War. A nine-year client brings a competitor's term sheet: 40 basis points inside your pricing, covenant-lite, and a Friday deadline. Your call first, then the senior banker's.
// 01 — WHY A LENDER WANTS THE LOAN TO END FIRST
Much business lending is repaid from a source with an end date: a council contract, a building's leases, a machine's working life, a concession. A lender sizing a loan against that income can choose when the loan finishes, and the tail is the part of the income it deliberately leaves outside the repayment schedule.
The reason is what happens when a forecast slips. If the loan matures before the contract ends, a fall in income can be absorbed by stretching what is still owed into years the contract still pays for. If the loan matures on the contract's last day, the only room is the cover left in each remaining year, and a fall that outlasts it leaves debt owing when the income stops. That debt must then come from a renewal not yet won, from the owners, or from a new lender asked to fund a business whose income is about to stop. The tail is what turns a lasting shortfall into an amendment rather than a default.
// 02 — HOW THE TAIL IS MEASURED
Years are the simplest measure. Cash matters because a contract's last years can be its weakest, with handback obligations or decommissioning costs. The value measure sets the loan life cover ratio beside the project life cover ratio, which discounts the same cash flow to the end of the contract or asset life rather than to the end of the loan; the difference between the two is the tail expressed as cover. In mining and oil and gas the idea is measured in the ground, as the share of reserves forecast to remain when the loan is repaid.
What counts as the end of the income is a credit choice. A cautious lender measures to the contract's expiry date, not to the renewal the borrower expects; for a property, the lease expiries summarised in the weighted average lease expiry; for equipment, its working life. The Basel Committee's slotting criteria for project finance, applied in national form by banks with approval to use internal ratings, grade a project partly on whether its useful life exceeds the loan's tenor and whether an off-take contract outlasts the debt. A contract that ends before the debt matures is listed among the weak features.
// 03 — THE EXAMPLE
A waste-collection contractor, constructed for this page like every figure in it, borrows US$10m to replace its truck fleet. Its council contract has nine years to run, and the cash it leaves for debt service is forecast at US$2.4m a year. The loan costs 7% and is repaid in equal annual instalments of interest and principal. The bank compares two schedules. Neither the rate nor the tail is offered as a market norm.
The nine-year loan looks safer on every annual ratio. The seven-year loan has thinner cover but leaves two years of contract income, US$4.8m before discounting, outside the schedule. The PLCR is the same for both because the business and its contract are the same; what differs is how much of the contract's value the loan leaves unused.
Now let the cost base move for good. From year 3, fuel and wages rise faster than the contract's annual price review allows, and cash for debt service settles at US$1.5m a year for the rest of the contract.
The nine-year loan misses by little, but it misses in every remaining year, and the only place left for the shortfall is past the contract's end, where repayment rests on a renewal the council has not offered. The seven-year lender stretches its loan over the two years it left behind and is repaid, thinly, inside the contract. Part of the difference was earned in the good years, when the faster schedule repaid US$0.66m more principal; the rest is the two years of income the loan did not rely on. The tail is what lets that conversation end in a rescheduling the contract can pay for.
// 04 — HOW IT DIFFERS FROM TENOR AND REFINANCING RISK
Tenor is the length of the loan itself; the tail is measured against something outside the loan. Two seven-year loans can have tails of two years or none, depending on what repays them. Refinancing risk is the risk that a loan falling due cannot be replaced. A loan that ends in a large balloon carries that risk, and its tail is what the next lender would be lending against: a balloon due two years before the contract ends asks a new lender to accept, at most, two years of income behind its loan.
The tail also differs from a debt service reserve account. A reserve holds cash already earned, set aside against the next payment dates. The tail is cash not yet earned, available only if the contract keeps paying. A file can carry both, and they answer different questions: the reserve, whether the next instalment can be met; the tail, whether the loan can still finish.
DEFINED IN ONE PARAGRAPH → · LOAN LIFE COVER RATIO → · THE TERM LOAN, PRODUCT FILE →
// 05 — WHERE IT DECIDES A FILE
The tail is set when the loan is structured, in the same conversation as tenor and repayment profile. A borrower asks for the longest amortisation because it lowers the instalment and lifts the cover ratio, as the example shows. A lender weighs that against what is left behind the loan. The trade shows in the term sheet's final maturity set against the contract's expiry, in any cover ratio measured to the end of the project rather than the end of the loan, and in what the bank asks for when renewal is the hoped-for source of repayment: a decision date on the renewal well before maturity, or a cash sweep that shortens the loan if the renewal is not won.
Outside project finance, a property loan is read against when its leases expire, and an equipment loan against the machine's working life, because a loan that outlives its asset is secured on something that has stopped earning. In each, the question is the same: if the forecast slips by a year, is there anything left to slip into?
REFINANCING A BUSINESS LOAN → · SIX MONTHS BEFORE YOUR LOAN MATURES → · DEBT SERVICE COVER →
// SOURCES
The documents the statements on this page rest on. Each was opened and checked when cited.
- Basel Committee on Banking Supervision, The Basel Framework, CRE33 IRB approach: supervisory slotting approach for specialised lending, version effective 15 December 2019 — paragraph 33.13 — The project finance slotting table grades the duration of the credit against the duration of the project (useful life exceeding tenor) and the tenor of an off-take contract against the maturity of the debt, with a contract that does not exceed the debt's maturity among the weak features — section 02.
// QUESTIONS PEOPLE ASK
- What is the tail in project finance?
- It is the period between the final repayment date of the project's debt and the end of the income that repays it: the expiry of the off-take contract, the concession or the asset's useful life. During the tail the project is still forecast to earn but owes the lenders nothing on schedule. That gives the lenders room to reschedule a shortfall, and gives a refinancing lender income to lend against. Where the two dates coincide, the tail is nil.
- What is the difference between LLCR and PLCR?
- Both divide the present value of the cash available for debt service by the debt outstanding. The loan life cover ratio counts that cash only up to the loan's final maturity. The project life cover ratio counts it to the end of the project or contract. The gap between them measures the value of the cash that falls after the loan is repaid, which is the tail. Where the loan runs to the end of the contract, the two ratios are the same.
- How long a tail do lenders want on a term loan?
- There is no single answer. It depends on how reliable the late years are, whether income after a contract ends is plausible at all, what the asset is worth then, and how volatile the forecast is in the meantime. Some lenders express a tail as a proportion of the contract or concession life, others in years or in cover. The two-year tail on this page belongs to its example and is not offered as a standard.
- What is a reserve tail in mining or oil and gas lending?
- It is the tail measured in the ground: the share of a field's or mine's reserves forecast to remain when the loan is repaid, set against the reserves at first drawing or at a later calculation date. It protects the lender against reserves proving smaller, or slower to extract, than the engineer's report expects. Agreements that use it test it beside the cover ratios.
THE IN-TRAY · ONE MINUTE
Make the call on one file.
A short file on the ground this page covers. Every option opens with how far it sits from a senior banker’s read.
1 FILES · PICK A CALL ON ANY OF THEM
5 MORE ON THE LOAN · CAPACITY →WHERE DO YOU READ FROM? THE PLACEMENT →
// SUBSCRIBE
The Lab.
One case file and one question, in your inbox every Tuesday morning, New Zealand time. The senior banker's read opens only after you answer.
FREE WITH IT · ANNOTATED PDF
A complete credit paper on a published file, with the approver's notes on what each section has to answer.
No spam. Unsubscribe anytime. Educational content only.
