// WORKED EXAMPLETHE ARITHMETIC A DECISION RESTS ON

Residual Land Value: a Worked Example

Work back from the finished scheme, and the land is what is left.

BY MICHAEL SHANG · SIXTEEN YEARS IN COMMERCIAL BANKING · UPDATED

// THE SHORT ANSWER

Residual land value answers the question a development lender asks of every site: how much could a developer pay for this land and still build the scheme at a fair return? The valuer starts from what the finished scheme would sell for, takes away everything it costs to get there, including the profit a developer would want for the risk, and treats what remains as the land's worth. Because the land is the last line of the sum, every error above it lands there in full. A modest fall in prices can remove a large share of the answer, so a lender reads it with its sensitivity attached.

BASIS  Practitioner judgment from sixteen years in commercial banking, set out in How Bankers Think (Highbank Press, 2026). Every borrower on this site is a composite constructed for teaching, not a client. The market is mid-market commercial lending as practised in New Zealand and Australia; where a convention differs elsewhere, the page says so.

// MAKE THE CALL

Issue 08 — Basalt Ridge Developments. A new-to-bank developer, a claimed 28% ROE and two other banks circling. Your bank has a growth target. Your call first, then the senior banker's.

Read the file →

// 01 — WHY A LENDER WORKS THE LAND BACKWARDS

A site with development potential is rarely like any other site. Its value depends on what may be built on it, how many units, at what cost and selling at what price, so sales of other land are a check rather than an answer. The residual method values the land through the scheme instead. The RICS standard on valuing development property puts it as the value after development, less the cost of undertaking it, including a profit for the developer.

A lender meets the number three times. It is the security for any loan advanced against the land before building starts. It is the figure a developer may ask to count as equity when land bought years ago is now worth more. And it is the test of the price paid: land bought above its residual leaves the developer with less profit than the scheme needs, and the shortfall comes out of the cushion that protects the bank.

// 02 — HOW THE RESIDUAL IS CALCULATED

Gross development value (the finished scheme's sales)
− construction, including contingency
− professional fees, consents and levies
− sales and marketing costs
− finance costs, including interest on the land
− developer's profit, on cost or on value
= residual, before acquisition costs
− purchase costs and any transfer tax
= residual land value

The deductions are estimates of the future, so the method is only as good as its inputs. Where GST applies to the sales, as it can on new homes in New Zealand and Australia, the value is read net of it, since the tax is not the developer's money. Finance and profit make the sum circular: interest on the land depends on what is paid for it, and a profit set as a share of total cost includes the land itself. Valuation software solves this by iteration. For larger schemes a valuer may model the cash flows month by month and discount them, which handles timing better than a single sum, and RICS treats both forms as the residual method.

// 03 — THE EXAMPLE

A site with consent for 19 terraced houses, constructed for this page like every figure in it, is expected to sell for an average of US$1.2m each. The construction estimate is US$12.6m with contingency, fees and consents US$1.5m, finance US$1.4m, sales costs 3% of value, and the profit is set at 15% of value. The 3% and the 15% are the example's, not a market norm.

Gross development value 19 × 1.20 22.80
Construction and contingency − 12.60
Fees and consents − 1.50
Sales costs at 3% − 0.68
Finance − 1.40
Profit at 15% of value − 3.42
Residual before purchase costs 3.20
Purchase costs − 0.10
Residual land value 3.10
Prices 5% lower: GDV 21.66 → land value 2.16 (−30%)
Build 5% dearer: cost 13.23 → land value 2.47 (−20%)

A 5% change in the sales value moves the land value by six times as much. That is the gearing of a residual: the land is a thin slice at the bottom of a large sum, and while the profit allowance and the sales costs fall with the prices, the build cost does not. Now suppose the developer paid US$3.6m for the site. Holding the other costs as they are, which flatters the result slightly because a dearer site carries more interest, the scheme's profit is no longer US$3.42m:

22.80 − (12.60 + 1.50 + 0.68 + 1.40 + 3.60 + 0.10) = 22.80 − 19.88 = 2.92
Profit on value 2.92 ÷ 22.80 = 12.8% (the scheme was assumed to need 15%)

// 04 — WHAT A LENDER READS BESIDE IT

The residual and the margin are one sum read two ways. Fix the profit and solve for the land, and the answer is the residual land value. Fix the land at its price and solve for the profit, and the answer is the scheme's profit on cost or on value, the developer's cushion. RICS describes the second use directly: the same method gives the surplus left for profit once the land price is known. A lender usually has both in front of it, and a gap between them is a question about the developer's judgment when it bought.

The second check is the market. Sales of comparable sites, adjusted for consent, density and condition, show whether the residual is plausible. RICS emphasises that a single method should not be relied on alone for development land. Where the two disagree, a lender asks why before relying on either.

DEFINED IN ONE PARAGRAPH → · PROFIT ON COST, WORKED → · DEVELOPMENT FEASIBILITY →

// 05 — WHERE IT DECIDES A FILE

It decides how much of the land counts. A developer that bought the example's site years ago for US$2.2m, where the residual is now US$3.1m, may ask the bank to treat the land as US$3.1m of equity. The uplift is real only if the scheme's prices and costs hold, and the sensitivity shows how quickly it can go. Lenders differ on whether to count land at cost, at an independent valuation, or at the lower of the two.

It also decides the land loan, if any is advanced before construction, and it explains why a change in consent can change a file overnight: more units raise the residual, while a new levy or a higher build estimate lowers it. A residual can even be negative, when a scheme would cost more than it sells for, and no price paid for that land makes the scheme work as drawn.

PROPERTY DEVELOPMENT FINANCE → · ON-COMPLETION VALUE →

// SOURCES

The documents the statements on this page rest on. Each was opened and checked when cited.

  1. RICS, Valuation of development property, RICS professional standard, global, 1st edition (October 2019, effective 1 February 2020; reissued as a professional standard April 2023) — paragraphs 6.1.1, 6.1.2, 6.1.3, 7.1.2 and B2.2.3.1–B2.2.3.2 — Sets out the residual method as GDV less total development costs including profit, with a basic and a discounted cash flow application; notes that small variations in inputs cause large variations in the residual and that no single method should be relied on; and says profit is usually expressed on cost or GDV and varies by case — sections 01 to 04 and the FAQ.

// QUESTIONS PEOPLE ASK

How do you calculate residual land value?
Start with the gross development value, what the finished scheme is expected to sell for. Deduct the costs of creating it: construction and contingency, professional fees and consents, sales and marketing, and finance. Deduct the profit a developer would need for the risk, as a share of cost or of value. What remains is the amount available for the land, from which purchase costs and any transfer tax are taken to give the residual land value.
Can residual land value be negative?
Yes. If a scheme's costs, including a reasonable profit, exceed what it would sell for, the residual is below zero, which means the scheme as designed does not justify buying the land at any price. A developer facing a negative residual changes the scheme, its density, mix or specification, waits for prices to move, or accepts a lower profit. A lender reading one is being told that the proposal does not stand up as drawn.
What profit margin is used in a residual valuation?
There is no single figure. RICS says the margin depends on the nature of the scheme and market practice for the sector, and varies case by case. It is usually expressed as a share of total development cost or of gross development value. Factors that reduce risk, such as pre-sales or pre-lets, a fixed-price building contract or a short programme, tend to justify a lower margin; a speculative or complex scheme a higher one.
What is the difference between residual land value and market value?
Market value is what the land would sell for between willing parties on the valuation date. Residual land value is one way of estimating it, by working back from a particular scheme. The two can differ: a residual reflects one scheme's assumptions, while the market may price in a different scheme, a consent not yet granted, or buyers willing to accept less profit. Valuers commonly use comparable land sales as a check on the residual.

THE IN-TRAY · ONE MINUTE

Make the call on one file.

A short file on the ground this page covers. Every option opens with how far it sits from a senior banker’s read.

SIGNAL OR NOISE · THE ECONOMY · COLLATERAL MARKETS

A loan is secured on a specialised cold-store warehouse. Similar warehouses in the region have taken two years to sell.

Signal or noise?

1 FILES · PICK A CALL ON ANY OF THEM

3 MORE ON THE ECONOMY · COLLATERAL MARKETS →WHERE DO YOU READ FROM? THE PLACEMENT →